Kajaani · Finland

LUMI Data Center, Kajaani

Operated by CSC. Hosting 3 systems in this dataset, 2 of them currently operational.

Systems hosted
3
Installed Rmax
379.7 PFlop/s
all eras, as reported
Recorded power
7.11 MW
where disclosed
Cooling
Direct liquid cooling, warm water

Facility facts

Power, cooling and efficiency figures for LUMI Data Center, Kajaani, each with its own source and date.

FactValueAs ofBasisSource
Renewable share of supply 100 percent LUMI page states its energy consumption is covered by 100 percent renewable electricity; page undated, fetched 2026. 2025 Operator stated lumi-supercomputer.eu
Facility power 230 MW Site electrical infrastructure ready for up to 230 MW, with a national grid connection offering more; this is site capacity, not LUMI draw. 2025 Operator stated lumi-supercomputer.eu
PUE 1.24 CSC article of 2023-04-25: PUE 1.24 with excess-heat utilisation and 1.04 without it; heat-pump energy raises the figure when heat is reused. Averaging period not stated. 2023-04 Operator stated csc.fi
Heat reuse Excess heat feeds Kajaani district heating, covering about 20 percent of the city's annual district heat and offsetting about 12,400 tonnes CO2 per year LUMI page also states excess heat warms hundreds of households in Kajaani. 2023-04 Operator stated csc.filumi-supercomputer.eu
Renewable share of supply 100 percent CSC states LUMI runs on 100% carbon-free hydroelectric energy 2022-11 Operator stated csc.fi
Heat reuse Waste heat reused for about 20% of Kajaani district heating EuroHPC release gives the 20% figure; CSC article says waste heat can warm nearby homes 2020-10 Operator stated eurohpc-ju.europa.eucsc.fi

Systems at this site

SystemRmaxPowerFirst operationalStatus
Roihu - - 2026-06 operational
LUMI 379.7 PFlop/s 7.11 MW 2022-06 upgraded
LUMI-AI - - - planned

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.