COMPUTE ATLAS Supercomputer supply-chain graph
1345 systems 511 sites Sourced data

Supercomputers/Systems/Anselm

Czechia · decommissioned · hpc

Anselm

Also known as IT4Innovations Anselm; Anselm Bull cluster

Operated by IT4Innovations at IT4Innovations, Ostrava .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
73.00 TFlop/s
operator stated
Rpeak
94.00 TFlop/s
Rmax ÷ Rpeak
77.7%
Cores
-
Power
77 kW
Per watt
0.9 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Bull supplied the system (built by Atos)
Bull
ATOEPA rolls up to Atos
- Reported ostrava.czdocs-old.e-infra.cz
Accelerator -
NVIDIA Tesla Kepler K20m GPUs, 23 nodes
NVIDIA 23
reported
Reported docs-old.e-infra.cz
CPU -
Intel Sandy Bridge E5-2665 8-core 2.4 GHz, 180 compute nodes
Intel 180
reported
Reported docs-old.e-infra.cz
Interconnect Mellanox InfiniBand QDR
Interconnect
Fat tree · 40 Gb/s per 4x port
InfiniBand QDR fully non-blocking fat tree
NVIDIA - Reported docs-old.e-infra.cz

The read

The first supercomputer of the Czech IT4Innovations centre at VSB-Technical University of Ostrava, built by Bull (now Atos) and christened on 24 May 2013. The archive page says it ran from the second quarter of 2013 to the first quarter of 2021, with 209 compute nodes, 94 TFlop/s theoretical peak, 77 kW power draw and an original cost of 90 million CZK. The hardware overview lists 180 regular nodes with two Sandy Bridge E5-2665 8-core CPUs, 23 nodes with NVIDIA Tesla K20m GPUs, 4 nodes with Xeon Phi 5110P and 2 fat nodes with 512 GB, on a non-blocking InfiniBand QDR fat tree with Lustre /home (360 TB) and /scratch (146 TB), 15.1 TB RAM in total and 73 TFlop/s maximum Linpack. It was retired into an exhibition at Lower Vitkovice. Salomon and Karolina are recorded separately.

Timeline

Site & facility

IT4Innovations, Ostrava

Location
Ostrava, Czechia
Cooling
Direct liquid cooling
Commissioned
2013

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
docs-old.e-infra.cznames system only-
ostrava.cznames system only-

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.

Further reading