Supercomputers/Systems/Marble (CoreWeave)

USA · operational · ai training

Marble (CoreWeave)

Also known as Core Scientific Marble 1 for CoreWeave

Operated by CoreWeave at Core Scientific Marble Data Center .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Core Scientific Marble 1 high-density data center, 117 MW total power capacity
Core Scientific - Reported corescientific.com
Accelerator -
Epoch AI: about 15,000 Grace Blackwell GPUs supported at the two-hall 36 MW stage in March 2026 (estimate; Epoch also types the chips as B200)
NVIDIA 15,000
estimated
Reported epoch.ai

Engineering, funding and access

What Marble (CoreWeave) runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Cooling designAir-cooled chillers: Epoch AI counts 51 units with 67.8 MW capacityCounted from satellite imagery; Core Scientific's page does not describe cooling.2026-05Third-party estimateepoch.ai

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 15,000 accelerators 2026-03-13 Third-party estimate Epoch AI: about 15,000 Grace Blackwell GPUs at the two-hall, about 36 MW stage in March 2026; later 65 MW state not broken out. epoch.ai
Stated investment 2.5 USD bn 2026-05-06 Third-party estimate Epoch AI modelled build cost including compute (2025 USD), not a disclosed spend. epoch.ai
IT power 65 MW 2026-05-06 Third-party estimate Epoch AI relays Core Scientific saying Marble was fully handed over to CoreWeave with about 65 MW of billable customer power. epoch.ai

The read

Core Scientific's Marble 1 campus near Marble, North Carolina, a former bitcoin-mining site converted to high-density GPU hosting for CoreWeave. Core Scientific's own page lists 117 MW of total power capacity on a 70-acre, 250,000 sq ft campus and names no GPU model or count. Epoch AI's tracker (CC BY 4.0) relays Core Scientific disclosures that two of three data halls were delivered at about 36-37 MW in March 2026, supporting about 15,000 Grace Blackwell GPUs, and that on 6 May 2026 Marble was fully handed over to CoreWeave with about 65 MW of billable power; Epoch itself estimates about 79k H100-equivalents and a 2.5 bn USD build cost, and types the chips as B200 even while quoting 'Grace Blackwell', so the GPU model is unconfirmed and the 15,000 figure describes the earlier two-hall stage. CoreWeave is recorded as operator because it is the tenant, as with Denton (core-scientific-denton-coreweave) and Muskogee (core-scientific-muskogee-coreweave). Hardware and operating power rest on Epoch alone, so those figures sit in the metrics table as estimates.

Timeline

  • 2026-03-13 Site energised, with two of three data halls delivered at about 37 billable MW and the third in commissioning, per Epoch AI's reading of Core Scientific disclosures source
  • 2026-05-06 Core Scientific says Marble is fully handed over to CoreWeave with about 65 MW of billable customer power online source