India · planned · ai training

CoreWeave Taloja AI Campus

Also known as CoreWeave India 240 MW; AdaniConneX Taloja

Operated by CoreWeave at CoreWeave Taloja Navi Mumbai Campus .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
CoreWeave is sole tenant across three 80 MW buildings at AdaniConneX's Taloja campus in Navi Mumbai and will own and run the compute
CoreWeave
- Reported coreweave.com
Accelerator NVIDIA Vera Rubin
Accelerators
NVIDIA Vera Rubin platform planned for the 240 MW Taloja campus; no unit count stated
NVIDIA - Reported coreweave.comthenextweb.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Facility power 240 MW 2026-10-06 Design target CoreWeave states 240 MW of data center capacity in three 80 MW buildings; IT versus total not stated. First phase expected mid-2028. coreweave.comthenextweb.com

The read

CoreWeave's first India deployment, announced 6 October 2026: 240 MW across three 80 MW buildings at AdaniConneX's Taloja campus in Navi Mumbai, with CoreWeave as sole tenant and an option to add up to another 240 MW. CoreWeave plans to deploy the NVIDIA Vera Rubin platform, with direct liquid cooling for the GPU halls and a non-evaporative chilled water system. The first phase is expected in mid-2028 and no GPU count is stated. AdaniConneX is a 50:50 joint venture of Adani Enterprises and EdgeConneX per The Next Web. The second page is trade press repeating the CoreWeave release, so the tier is reported. It has never submitted an HPL result.

Timeline

Site & facility

CoreWeave Taloja Navi Mumbai Campus

Location
Navi Mumbai, India
Cooling
Direct liquid cooling for GPU data halls with a non-evaporative chilled water system

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
coreweave.comnames system and partNVIDIA Vera Rubin
thenextweb.comnames system and partNVIDIA Vera Rubin

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.