Supercomputers/Systems/evroc Arlandastad AI Data Center

Sweden · planned · ai training

evroc Arlandastad AI Data Center

Also known as evroc Stockholm flagship data center

Operated by evroc at evroc Arlandastad Site .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator -
NVIDIA Blackwell-based GPU cluster that evroc is bringing live; Arlandastad site capacity of up to 10,000 GPUs
NVIDIA - Reported datacenter-forum.com
Cooling -
Liquid cooling for energy density above 150 kW per rack with excess heat recycled into district heating
evroc
- Reported datacenter-forum.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 10,000 accelerators 2025-07-08 Design target Arlandastad site has capacity for up to 10,000 GPUs; a planned site capacity, not an installed count. datacenter-forum.com
Rack power 150 kW 2025-07-08 Design target Energy density stated as exceeding 150 kW per rack; 150 is the stated floor. datacenter-forum.com

The read

evroc's flagship data center in Sweden, to be located at Arlandastad near Stockholm airport with capacity for up to 10,000 GPUs, liquid cooling and energy density above 150 kW per rack. It is designed to run on fossil-free energy and recycle excess heat into the local district heating network. Datacenter Forum reported on 8 July 2025, when evroc launched its sovereign cloud with an NVIDIA Blackwell-based GPU cluster, that Arlandastad was still the planned flagship; the 10,000 figure is a site capacity, not an installed count, and no MW figure is stated. A single trade-press source, so the tier is reported. It has never submitted an HPL result.

Timeline

Site & facility

evroc Arlandastad Site

Location
Arlandastad, near Stockholm, Sweden
Cooling
Liquid cooling with excess heat recycled into district heating

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
datacenter-forum.comnames system only-

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.