Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
38.17 TFlop/s
HPL measured
Rpeak
49.73 TFlop/s
Rmax ÷ Rpeak
76.8%
Cores
5,336
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
ACTION integrated the cluster, with WASKO, as a consortium
ACTION S.A.
- Reported top500.orgdocs.task.gda.pl
Integrator -
WASKO integrated the cluster, with ACTION, as a consortium
WASKO S.A.
- Reported docs.task.gda.pl
CPU -
Intel Xeon E5345 quad-core 2.33 GHz, 1,344 processors on 672 boards
Intel 1,344
reported
Reported docs.task.gda.pltop500.org

The read

The Xeon quad-core InfiniBand cluster that CI TASK, the Gdansk University of Technology computing centre, commissioned in February 2008 and that TASK's history page calls the fastest machine in Poland at the time. TASK's documentation (filed under retired systems) describes 336 servers with 672 boards and 1,344 Intel Xeon quad-core 2.33 GHz processors, 5,376 cores and 10.75 TB of memory, on a fat-tree InfiniBand fabric of 20 Gb/s links with Gigabit Ethernet management, 107.5 TB of disk and Debian Linux, integrated by a consortium of WASKO and ACTION, with a theoretical 50 TFlop/s; memory was doubled in June 2008. TASK says it reached 45th on the 18 June 2008 TOP500; TOP500 lists it at 46th with 5,336 cores, 38.17 TFlop/s Rmax and 49.73 TFlop/s Rpeak (ACTION Cluster Xeon E5345, InfiniBand DDR), on six lists to November 2010. The small differences in core count and rank are unresolved and the TOP500 figures are used, so the tier is reported. Galera Plus extended it and is recorded separately.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

CI TASK Data Centre (Gdansk)

Location
Gdansk, Poland

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
docs.task.gda.plnames system only-
top500.orgnames system only-

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.