COMPUTE ATLAS Supercomputer supply-chain graph
1345 systems 511 sites Sourced data

Supercomputers/Systems/Gottfried

Germany · operational · hpc

Gottfried

Also known as HLRN-III Gottfried; HLRN Hannover

Operated by LUIS Hannover .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
829.80 TFlop/s
HPL measured
Rpeak
1.24 PFlop/s
Rmax ÷ Rpeak
66.8%
Cores
40,320
Power
787.5 kW
Per watt
1.1 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Cray XC30, expanded to an XC40 with Haswell nodes
Cray - Verified top500.orgheise.de
CPU -
Intel Xeon E5-2695v2 12-core 2.4 GHz (17,856 cores in the first stage), later with E5-2680v3 12-core 2.5 GHz nodes
Intel - Verified top500.orgheise.de
Interconnect Cray Aries
Interconnect
Dragonfly · About 10 GB/s per direction · Around 1 microsecond
Cray Aries interconnect
Cray - Reported top500.org
Operating system Cray Linux Environment
Operating systems
Linux, Cray-customised · Proprietary layer over open-source Linux
Cray Linux Environment
Cray - Reported top500.org

The read

The Hannover half of the northern German HLRN-III complex, a Cray XC30 later expanded to an XC40, run at Leibniz University Hannover's IT services centre (formerly RRZN). Heise's report of 16 January 2014 says Gottfried and its Berlin twin Konrad (recorded as Konrad (HLRN-III)) were officially put into operation that day, named for Gottfried Wilhelm Leibniz, with 17,856 cores of 12-core Xeon E5-2695v2 each in the first stage and an EUR 30 million joint federal and state investment. TOP500 lists the same 17,856-core XC30 at 121st in November 2013 and then, after the Haswell expansion, 40,320 cores of Xeon E5-2695v2 and E5-2680v3 on the Aries network at 829.80 TFlop/s Rmax, 1,241.39 TFlop/s Rpeak and 787.5 kW, 62nd in November 2014 and 379th in June 2018, its last list. The status date is that last appearance.

Timeline

  • 2014-01 First operational source
  • 2014-11 List debut at #62 (November 2014) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
heise.denames system only-
top500.orgnames system and partCray Aries, Cray Linux Environment

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.

Further reading