COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/iREMB

South Korea · operational · hpc

iREMB

Also known as DGIST iREMB

Operated by DGIST Supercomputing & Big Data Center .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
470.00 TFlop/s
HPL measured
Rpeak
980.00 TFlop/s
Rmax ÷ Rpeak
48.0%
Cores
14,400
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of iREMB, and those in South Korea. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax470.00 TFlop/s#190 of 242 · bottom 23%#21 of 32 · bottom 36%
Rmax ÷ Rpeak48.0 %#230 of 238 · bottom 4%#31 of 32 · bottom 4%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cluster Platform DL380
Hewlett Packard Enterprise - Reported top500.org
Accelerator -
NVIDIA Tesla K40
NVIDIA - Reported top500.orgdhnews.co.kr
CPU -
Intel Xeon E5-2650v3 10C 2.3GHz
Intel - Reported top500.org

The read

iREMB is the open GPU cluster of the DGIST Supercomputing and Big Data Center for education and research. A Korean news report of 16 November 2016 says it ranked 351st on the November 2016 TOP500 at 470 TFlop/s, up 53 percent from June after a GPU upgrade and optimisation, and was the top South Korean open system for pure education and research; DGIST planned a 10 Gbps KOREN link. TOP500 lists an HPE Cluster Platform DL380 with Xeon E5-2650v3 10C 2.3 GHz, 10G Ethernet and NVIDIA Tesla K40: 10,244 cores at 456th in June 2016, then 14,400 cores at 352nd in November 2016 and 456th in June 2017, with 0.47 PFlop/s Rmax and 0.98 PFlop/s Rpeak (rank figures differ by one from the news report).

Timeline

  • 2016 First operational source
  • 2016-11 List debut at #352 (November 2016) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Nearby in scale

The machines closest to iREMB by Rmax, smaller to larger.

Further reading