COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/NCEP Tide

USA · operational · hpc

NCEP Tide

Also known as Tide

Operated by NOAA .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
705.90 TFlop/s
HPL measured
Rpeak
776.09 TFlop/s
Rmax ÷ Rpeak
91.0%
Cores
37,312
Power
775.04 kW
Per watt
0.9 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of NCEP Tide, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax705.90 TFlop/s#90 of 227 · top 39%#195 of 332 · bottom 42%
Energy efficiency0.9 GF/W#116 of 186 · bottom 39%#101 of 162 · bottom 39%
Rmax ÷ Rpeak91.0 %#24 of 226 · top 10%#15 of 331 · top 4%
Power draw775 kW#67 of 188 · top 35%#72 of 171 · top 42%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
IBM iDataPlex DX360M4
IBM - Reported top500.orgnextplatform.com
CPU Intel Xeon E5-2670
CPUs
x86-64 · 8C · 2.6 GHz · 32 nm · 115 W
Intel Xeon E5-2670 8C 2.6GHz
Intel - Reported top500.org
Interconnect Mellanox InfiniBand FDR
Interconnect
Fat tree · 56 Gb/s per 4x port · About 1 microsecond
Infiniband FDR (56 Gb/s)
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported top500.orgnextplatform.com
Storage IBM Spectrum Scale ESS (GPFS)
Storage
Parallel filesystem (GPFS), erasure-coded declustered RAID · 250 PB on Summit (Alpine) · About 2.5 TB/s
8.1 PB GPFS parallel file system shared with the Cray XC40 systems
IBM - Reported nextplatform.com
Operating system Red Hat Enterprise Linux
Operating systems
Linux distribution · Open source, commercial support subscription
Red Hat Enterprise Linux
Red Hat
IBMNYSE rolls up to IBM
- Reported nextplatform.com

Engineering, funding and access

What NCEP Tide runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topology56 Gb/s FDR InfiniBand2016-01Press reportnextplatform.com

Software

ItemDetailAs ofBasisSource
Job schedulerIBM LSF2016-01Press reportnextplatform.com
Programming and software stackRed Hat Enterprise Linux2016-01Press reportnextplatform.com

Funding

ItemDetailAs ofBasisSource
ProcurementIBM iDataPlex under the ten-year WCOSS contract worth USD 502 million, awarded March 2011; first fired up July 2013; expanded January 2015The contract value covers the whole WCOSS program, not Tide alone.2016-01Press reportnextplatform.com

The read

One of the two IBM iDataPlex DX360M4 clusters of NOAA's Weather and Climate Operational Supercomputing System, the one in the Virginia data center; its twin Gyre (ncep-gyre) sits in the Orlando backup center. Next Platform dates the first firing-up of the pair to July 2013 and says IBM added iDataPlex nodes in January 2015, taking each cluster to about 830 TFlop/s peak (167 TFlop/s at first, then 64 and 599 TFlop/s added). TOP500 lists 37,312 cores of Xeon E5-2670, 705.9 TFlop/s Rmax, 776.09 TFlop/s Rpeak and 775.04 kW, with 2012 as the installation year; the 776 TFlop/s peak is below Next Platform's 830 TFlop/s figure and the dataset records TOP500's numbers. Both iDataPlex clusters shared an 8.1 PB GPFS file system with the Cray XC40 pair that was accepted in December 2015 (noaa-luna and noaa-surge). Listed from June 2015 to November 2017, falling from rank 103 to 379. Only the TOP500 page gives Rmax and Rpeak, so the tier is reported.

Timeline

  • 2011-03 NOAA awarded IBM the ten-year, USD 502 million WCOSS contract under which Tide and Gyre were built source
  • 2013-07 First operational source
  • 2015-01 IBM added iDataPlex nodes, taking the WCOSS iDataPlex capacity to about 830 teraflops of aggregate compute source
  • 2016-06 List debut at #147 (June 2016) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Nearby in scale

The machines closest to NCEP Tide by Rmax, smaller to larger.

  • BEM · Poland, operational · 0.7 PFlop/s
  • Dammam (2017) · Saudi Arabia, operational · 0.69 PFlop/s
  • Galileo · Italy, decommissioned · 0.68 PFlop/s
  • NCEP Gyre · USA, operational · 0.71 PFlop/s
  • Owens · USA, decommissioned · 0.71 PFlop/s
  • Blue Brain IV · Switzerland, decommissioned · 0.72 PFlop/s

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
nextplatform.comnames system and partIntel Xeon E5-2670, Mellanox InfiniBand FDR
top500.orgnames system and partIntel Xeon E5-2670, Mellanox InfiniBand FDR

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading