Supercomputers/Systems/NFD Korea Dangjin Campus

South Korea · planned · ai training

NFD Korea Dangjin Campus

Also known as NFD Korea 300 MW Dangjin AI campus

Operated by NFD Korea at NFD Korea Dangjin Site .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
NFD Korea develops the six-phase 300 MW campus
NFD Korea
- Reported w.media
Cooling -
Liquid cooling supporting rack power densities up to 160 kW
NFD Korea
- Reported w.media

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Facility power 300 MW 2026-07-08 Design target Total power supply of 300 MW under a KEPCO agreement; scope not stated. w.media
Rack power 160 kW 2026-07-08 Design target Rack power densities up to 160 kW depending on customer requirements, with liquid cooling. w.media

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Grid - 300 contracted 2026-07 Operator stated Power supply agreement with Korea Electric Power Corporation (KEPCO) for 300 MW. w.media

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

The read

NFD Korea's AI-ready campus in Dangjin, South Chungcheong, announced on 8 July 2026: 300 MW built in six phases for AI training and inference, with construction permits secured, a 300 MW power supply agreement with KEPCO, liquid cooling and rack densities up to 160 kW, and phase one ready for service in the first quarter of 2028. Only one outlet's report was fetched and no accelerator type or count is stated, so the tier is reported.

Timeline

Site & facility

NFD Korea Dangjin Site

Location
Dangjin, South Chungcheong, South Korea
Utility
KEPCO
Cooling
Liquid cooling supported

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
w.medianames system only-

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.