Supercomputers/Systems/NFD Korea Dangjin Campus
South Korea · planned · ai training
NFD Korea Dangjin Campus
Also known as NFD Korea 300 MW Dangjin AI campus
Operated by NFD Korea at NFD Korea Dangjin Site .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - NFD Korea develops the six-phase 300 MW campus | NFD Korea | - | Reported | w.media |
| Cooling | - Liquid cooling supporting rack power densities up to 160 kW | NFD Korea | - | Reported | w.media |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Facility power | 300 MW | 2026-07-08 | Design target | Total power supply of 300 MW under a KEPCO agreement; scope not stated. | w.media |
| Rack power | 160 kW | 2026-07-08 | Design target | Rack power densities up to 160 kW depending on customer requirements, with liquid cooling. | w.media |
How it is powered
| Source | Provider | MW | Status | As of | Basis | Note | Source link |
|---|---|---|---|---|---|---|---|
| Grid | - | 300 | contracted | 2026-07 | Operator stated | Power supply agreement with Korea Electric Power Corporation (KEPCO) for 300 MW. | w.media |
How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.
The read
NFD Korea's AI-ready campus in Dangjin, South Chungcheong, announced on 8 July 2026: 300 MW built in six phases for AI training and inference, with construction permits secured, a 300 MW power supply agreement with KEPCO, liquid cooling and rack densities up to 160 kW, and phase one ready for service in the first quarter of 2028. Only one outlet's report was fetched and no accelerator type or count is stated, so the tier is reported.
Timeline
- 2026-07-08 Announced source
Site & facility
NFD Korea Dangjin Site
- Location
- Dangjin, South Chungcheong, South Korea
- Utility
- KEPCO
- Cooling
- Liquid cooling supported
Change history
- 2026-10-09 Added NFD Korea Dangjin Campus
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| w.media | names system only | - |
Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.