COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/PARAM Kamrupa

India · operational · hpc

PARAM Kamrupa

Also known as IIT Guwahati PARAM Kamrupa

Operated by IIT Guwahati at IIT Guwahati Campus .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
operator stated
Rpeak
838.00 TFlop/s
Rmax ÷ Rpeak
-
Cores
7,408
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
NVIDIA Tesla V100 16GB, 2 per GPU node on 10 nodes (20 cards; 102,400 CUDA cores at 5,120 each)
NVIDIA 20
estimated
Reported iitg.ac.in
CPU -
2 x Intel Xeon Platinum 8268 24-core 2.9 GHz per node on 146 CPU, GPU-ready and high-memory nodes
Intel - Reported iitg.ac.in
CPU -
2 x Intel Xeon Gold 6248 20-core 2.5 GHz per node on 10 GPU nodes
Intel - Reported iitg.ac.in

The read

IIT Guwahati's flagship cluster under the National Supercomputing Mission, inaugurated by President Droupadi Murmu on 13 October 2022 (IIT Guwahati's HPC page and a Careers360 report agree on the date and on the 838 TF peak). The institute's page lists 75 CPU nodes, 32 GPU-ready CPU nodes and 39 high-memory nodes (768 GB) of dual Xeon Platinum 8268, plus 10 GPU nodes with dual Xeon Gold 6248 and two Tesla V100 16 GB cards each, for 7,408 CPU cores, 102,400 CUDA cores, 52 TB of memory and 1 PB of storage. The 102,400 CUDA-core total is exactly 20 V100s at 5,120 each, which is how the GPU count is derived. Neither page names the system builder or the interconnect, so no integrator or interconnect edge is recorded. The same page also lists an older machine, PARAM Ishan (operational since September 2016, 250 TF), and a separate 8-GPU RTX PRO 6000 Blackwell box dated July 2026, neither of which is counted here.

Timeline

Site & facility

IIT Guwahati Campus

Location
Guwahati, India

Change history

Same site

Same accelerator

Further reading