Supercomputers/Systems/Pure DC Seinajoki Campus
Finland · under construction · ai training
Pure DC Seinajoki Campus
Also known as Pure DC Finland AI campus
Operated by Pure DC at Pure DC Seinajoki Campus Site .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Pure DC develops the campus in repeatable 40 MW modules | Pure DC | - | Reported | w.mediapulse2.com |
| Cooling | - Direct liquid cooling in 40 MW modules for high-density computing | Pure DC | - | Reported | w.media |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Stated investment | 1.71 USD bn | 2026-07-15 | Operator stated | Phase 1 only: 1.5 billion euros (US$1.71 billion per the outlet); total investment exceeds 7.5 billion euros. | w.media |
| IT power | 110 MW | 2026-07-15 | Design target | Phase 1 IT capacity only; the campus is designed to scale beyond 550 MW. | w.mediapulse2.com |
The read
Pure Data Centres Group's AI data center campus on 370 acres in Seinajoki, Finland: a 110 MW first phase (1.5 billion euros, fully leased to hyperscale and technology customers, direct liquid cooling in repeatable 40 MW modules, first substation already live) designed to scale beyond 550 MW at over 7.5 billion euros, with over 700 MVA of renewable electricity available. Pure DC closed 1.3 billion euros of senior debt for phase one in July 2026 (SMBC, ABN AMRO, Citi, Societe Generale, Natixis). The tenants are not named in either page and no GPU type is stated, so the tier is reported.
Timeline
- 2026-07-15 Announced source
Site & facility
Pure DC Seinajoki Campus Site
- Location
- Seinajoki, Finland
- Cooling
- Direct liquid cooling
Change history
- 2026-10-09 Added Pure DC Seinajoki Campus
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| pulse2.com | names system only | - |
| w.media | names system only | - |
Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.