Supercomputers/Systems/Sierra
USA · decommissioned · classified
Sierra
Also known as ATS-2
Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 94.64 PFlop/s
- Rpeak
- 125.7 PFlop/s
- Rmax ÷ Rpeak
- 75.3%
- Cores
- 1,572,480
- Power
- 7.44 MW
- Per watt
- 12.7 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Sierra, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 94.64 PFlop/s | #3 of 223 · top 1% | #12 of 332 · top 3% |
| Energy efficiency | 12.7 GF/W | #22 of 133 · top 16% | #33 of 162 · top 20% |
| Rmax ÷ Rpeak | 75.3 % | #65 of 216 · top 30% | #159 of 331 · top 48% |
| Power draw | 7,438 kW | #5 of 137 · top 3% | #8 of 171 · top 4% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM Power System AC922 | IBM | - | Reported | hpc.llnl.govolcf.ornl.gov |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W NVIDIA Volta GV100, 4 per node | NVIDIA | 17,280 reported | Reported | hpc.llnl.govolcf.ornl.gov |
| CPU | IBM POWER9 22C CPUs POWER · 22C · 3.07 GHz · 14 nm · 190 W IBM POWER9 22C 3.1GHz | IBM | 8,640 reported | Reported | hpc.llnl.govolcf.ornl.gov |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds Dual-rail Mellanox EDR InfiniBand | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Reported | hpc.llnl.govolcf.ornl.gov |
| Storage | IBM Spectrum Scale ESS (GPFS) Storage Parallel filesystem (GPFS), erasure-coded declustered RAID · 250 PB on Summit (Alpine) · About 2.5 TB/s IBM Spectrum Scale (GPFS) at 120 PB | IBM | - | Reported | hpc.llnl.govasc.llnl.gov |
| Cooling | Direct-to-chip cold plate Cooling Cold plate on the package, air for the remainder · Removes roughly 50-80 percent of node heat to liquid IBM Power System AC922: water-cooled cold plates on CPU and GPU | IBM | - | Reported | hpc.llnl.govolcf.ornl.gov |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription Red Hat Enterprise Linux for POWER | Red Hat | - | Reported | hpc.llnl.govolcf.ornl.gov |
Engineering, funding and access
What Sierra runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 4,320 nodes4,284 batch and 36 debug nodes; each has 2 IBM POWER9 CPUs and 4 NVIDIA V100 GPUs, 17,280 GPUs in total | 2024 | Operator stated | hpc.llnl.gov |
| Interconnect and topology | Mellanox EDR InfiniBand | 2024 | Operator stated | hpc.llnl.gov |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Recommended parallel file space /p/gpfs1LLNL page gives the path only | 2024 | Operator stated | hpc.llnl.gov |
| Job scheduler | LSFQueues pdebug (18 nodes per job, 2 hours) and pbatch (2,048 nodes per job, 24 hours) | 2024 | Operator stated | hpc.llnl.gov |
| Programming and software stack | RHEL operating system | 2024 | Operator stated | hpc.llnl.gov |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | Advanced Simulation and Computing (ASC) program, platform class ATS-2, CORAL-1 | 2024 | Operator stated | hpc.llnl.gov |
| Procurement | CORAL award announced 14 Nov 2014: $325 million to build Summit at ORNL and Sierra at LLNL, both on IBM Power, NVIDIA Volta GPUs and Mellanox interconnectThe $325 million is for both machines combined; expected to be at least seven times more powerful than Sequoia | 2014-11-14 | Operator stated | science.osti.gov |
The read
Summit's sibling under the same CORAL procurement, with four V100s per node instead of six. The pairing is useful analytically: two systems, same vendors, same year, same fabric, different node ratios: a rare controlled comparison for anyone modelling accelerator-per-node trends. Stockpile stewardship workload.
Timeline
- 2014 Announced source
- 2014-11-14 DOE announces the CORAL award of $325 million to build Sierra at LLNL and Summit at ORNL, with Sierra expected to be at least seven times more powerful than Sequoia source
- 2018-06 List debut at #3 (June 2018) source
- 2018-06 First operational source
- 2025-09-30 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Livermore Computing Center
- Location
- Livermore, CA, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1996
Change history
- 2026-10-02 Marked Sierra decommissioned
- 2026-09-22 Gained a Green500 rank pointer (#62 on the 2023-11 list)
Nearby in scale
The machines closest to Sierra by Rmax, smaller to larger.
- Sunway TaihuLight · China, operational · 93.01 PFlop/s
- CHIE-3 · Japan, operational · 91.94 PFlop/s
- CEA-HE · France, operational · 90.79 PFlop/s
- Venado · USA, operational · 98.51 PFlop/s
- SSC-24 · South Korea, operational · 106.2 PFlop/s
- MAXIMUS-384 · USA, operational · 114.5 PFlop/s
Related systems
Same site
- Ansel (LLNL) · USA, operational, 2018
- Lassen · USA, decommissioned, 2018
- Corona · USA, operational, 2019
- Jade (LLNL) · USA, operational, 2016
- Magma (LLNL) · USA, operational, 2020
- Quartz (LLNL) · USA, decommissioned, 2016
Same operator
- Ruby (LLNL) · USA, operational, 2020
- rzVernal · USA, operational, 2022
- Tenaya · USA, operational, 2022
- Tioga · USA, operational, 2022
- Bengal · USA, operational, 2023
- Dane · USA, operational, 2023
Same accelerator
- ABCI · Japan, decommissioned, 2018
- Circe · USA, operational, 2018
- CLAIX-2018 · Germany, decommissioned, 2018
- COBRA · Germany, decommissioned, 2018
- Govorun · Russia, upgraded, 2018
- JUWELS Cluster · Germany, operational, 2018
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hpc.llnl.gov | names system only | - |
| olcf.ornl.gov | does not name this system | IBM POWER9 22C, Mellanox InfiniBand EDR, IBM Spectrum Scale ESS (GPFS) |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
Power and cooling
Why air ran out at 20 kW a rack, how warm-water cooling removes the chillers, and what PUE conceals.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.