USA · operational · classified

Sierra

Also known as ATS-2

Operated by Lawrence Livermore National Laboratory at Livermore Computing Center.

Phase 1 seed dataset — under review. These rows were compiled by hand from public operator, laboratory and vendor sources, and have not yet been through a second-reader verification pass. Every claim carries its source and a confidence tier; treat anything below verified as a lead, not a citation.

Measured performance

Rmax
94.64 PFlop/s
HPL measured
Rpeak
125.7 PFlop/s
Rmax ÷ Rpeak
75.3%
Cores
1,572,480
Power
7.44 MW
Per watt
12.7 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator
IBM Power System AC922
IBM Reported hpc.llnl.govolcf.ornl.gov
Accelerator NVIDIA Tesla V100
Accelerators
NVIDIA Volta GV100, 4 per node
NVIDIA 17,280
reported
Reported hpc.llnl.govolcf.ornl.gov
CPU IBM POWER9 22C
CPUs
IBM POWER9 22C 3.1GHz
IBM 8,640
reported
Reported hpc.llnl.govolcf.ornl.gov
Interconnect Mellanox InfiniBand EDR
Interconnect
Dual-rail Mellanox EDR InfiniBand
Mellanox
NVDANASDAQ rolls up to NVIDIA
Reported hpc.llnl.govolcf.ornl.gov
Operating system Red Hat Enterprise Linux
Operating systems
Red Hat Enterprise Linux for POWER
Red Hat
IBMNYSE rolls up to IBM
Reported hpc.llnl.govolcf.ornl.gov

The read

Summit's sibling under the same CORAL procurement, with four V100s per node instead of six. The pairing is useful analytically: two systems, same vendors, same year, same fabric, different node ratios — a rare controlled comparison for anyone modelling accelerator-per-node trends. Stockpile stewardship workload.

Timeline

  • 2014 Announced source
  • 2018-06 List debut at #3 (June 2018) source
  • 2018-06 First operational source

Public list appearances

Pointers only — rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Livermore Computing Center

Location
Livermore, CA, USA
Cooling
Direct liquid cooling (warm water)
Commissioned
1996