COMPUTE ATLAS Supercomputer supply-chain graph
1345 systems 511 sites Sourced data

Supercomputers/Systems/CoolMUC-2

Germany · decommissioned · hpc

CoolMUC-2

Also known as LRZ CoolMUC-2; CooLMUC-2

Operated by LRZ at Leibniz Supercomputing Centre, Garching .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
366.36 TFlop/s
HPL measured
Rpeak
465.92 TFlop/s
Rmax ÷ Rpeak
78.6%
Cores
11,200
Power
192.81 kW
Per watt
1.9 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Lenovo/IBM NeXtScale nx360M5 system (TOP500 listing)
Lenovo - Reported top500.org
CPU Intel Xeon E5-2697 v3
CPUs
x86-64 · 14C · 2.6 GHz · 22 nm · 145 W
Intel Xeon E5-2697v3 14-core 2.6 GHz (28-way Haswell-EP nodes), 812 nodes at full size
Intel - Reported doku.lrz.detop500.org
Interconnect Mellanox InfiniBand FDR
Interconnect
Fat tree · 56 Gb/s per 4x port · About 1 microsecond
InfiniBand FDR14 interconnect
NVIDIA - Verified doku.lrz.detop500.org
Operating system SUSE Linux Enterprise Server
Operating systems
Linux distribution · Open source, commercial support subscription
SUSE Linux Enterprise Server 15 SP1
SUSE
- Reported doku.lrz.de

The read

LRZ's hot-water-cooled Linux cluster segment with the same processor and cooling technology as SuperMUC Phase 2. LRZ's documentation says installation of the first subsystem began in December 2014, user operation started in May 2015, the final expansion ranked 261st on the November 2015 TOP500, adsorption chillers from Sortech turned waste heat into cooling for storage, and the system was shut off on Friday 13 December 2024. At the end it had 812 nodes of 28 cores each (28-way Haswell-EP, 2.6 GHz, 64 GB, InfiniBand FDR14), 1,400 TFlop/s peak and 290 kVA electric power fully loaded, under SLES15 SP1. TOP500 lists the 11,200-core Lenovo/IBM NeXtScale nx360M5 part (Xeon E5-2697v3 14C 2.6 GHz) at 366.36 TFlop/s Rmax, 465.92 TFlop/s Rpeak and 192.81 kW, 316th in June 2015 at 7,056 cores and 262nd in November 2015 (LRZ says 261st), and 469th in November 2016, its last list. TOP500's figures describe a subset of the final 812-node machine and are used as listed, so the tier is reported.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Leibniz Supercomputing Centre, Garching

Location
Garching, Germany
Cooling
Direct warm-water cooling
Commissioned
2006

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
doku.lrz.deblocked our fetch-
top500.orgnames system and partIntel Xeon E5-2697 v3, Mellanox InfiniBand FDR

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.

Further reading