Compute·Atlas

Supercomputers/Systems/Fugaku

Japan · operational · mixed

Fugaku

Operated by RIKEN at RIKEN Center for Computational Science.

Phase 1 seed dataset — under review. These rows were compiled by hand from public operator, laboratory and vendor sources, and have not yet been through a second-reader verification pass. Every claim carries its source and a confidence tier; treat anything below verified as a lead, not a citation.

Measured performance

Rmax
442.0 PFlop/s
HPL measured
Rpeak
537.2 PFlop/s
Rmax ÷ Rpeak
82.3%
Cores
7,630,848
Power
29.90 MW
Per watt
14.8 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator
Fujitsu
Fujitsu Verified r-ccs.riken.jpglobal.fujitsu
CPU Fujitsu A64FX
CPUs
A64FX 48C 2.2GHz
Fujitsu 158,976
reported
Verified r-ccs.riken.jpglobal.fujitsu
Interconnect Fujitsu Tofu Interconnect D
Interconnect
Tofu interconnect D
Fujitsu Verified r-ccs.riken.jpglobal.fujitsu
Cooling Direct liquid cooling, warm water
Cooling
direct water cooling
Fujitsu Reported r-ccs.riken.jpglobal.fujitsu

The read

158,976 A64FX nodes, no accelerators, no separate NIC — the Tofu D interconnect is on the CPU package. The shortest bill of materials of any modern leadership system: one company supplies the processor, the memory interface, the fabric and the integration. It is the counterexample to the assumption that top-end compute necessarily implies a multi-vendor supply chain, and the reason our accelerator-share chart has to handle a null accelerator role rather than treating every system as heterogeneous.

Timeline

  • 2014 Announced source
  • 2020-06 List debut at #1 (June 2020) source
  • 2020-06 First operational source

Public list appearances

Pointers only — rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

RIKEN Center for Computational Science

Location
Kobe, Japan
Cooling
Direct liquid cooling (warm water)
Commissioned
2010