COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/HiPerGator 2.0

USA · operational · hpc

HiPerGator 2.0

Also known as HPG2

Operated by University of Florida .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
738.07 TFlop/s
HPL measured
Rpeak
1.07 PFlop/s
Rmax ÷ Rpeak
68.7%
Cores
29,184
Power
384 kW
Per watt
1.9 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of HiPerGator 2.0, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax738.07 TFlop/s#129 of 230 · bottom 45%#192 of 332 · bottom 43%
Energy efficiency1.9 GF/W#88 of 180 · top 49%#85 of 162 · bottom 49%
Rmax ÷ Rpeak68.7 %#151 of 226 · bottom 34%#211 of 331 · bottom 37%
Power draw384 kW#109 of 182 · bottom 41%#103 of 171 · bottom 41%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell PowerEdge C6320
Dell Technologies - Reported top500.org
CPU Intel Xeon E5-2698 v3
CPUs
x86-64 · 16C · 2.3 GHz · 22 nm · 135 W
Intel Xeon E5-2698v3 16C 2.3GHz
Intel - Reported top500.org
Operating system Red Hat Enterprise Linux
Operating systems
Linux distribution · Open source, commercial support subscription
Red Hat Enterprise Linux 6.5
Red Hat
IBMNYSE rolls up to IBM
- Reported top500.org

Engineering, funding and access

What HiPerGator 2.0 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Funding

ItemDetailAs ofBasisSource
Stated cost8 USD mCost of the October 2015 expansion that added 30,000 cores to the existing HiPerGator.2015-10Press reportwuft.org

Results

ItemDetailAs ofBasisSource
Notable resultRanked second among US public university supercomputers and third among all US universities on the November 2015 TOP500 (2015)2015-11Press reportwuft.org

The read

The 2015 expansion of the University of Florida's HiPerGator, an $8 million project completed in October 2015 that added about 30,000 cores to the existing machine and, in the local press account, more than doubled its power. TOP500 lists it as a Dell PowerEdge C6320 system with 29,184 cores of Xeon E5-2698v3 16C 2.3 GHz, 738.07 TFlop/s Rmax, 1,073.97 TFlop/s Rpeak, 384 kW, InfiniBand and Red Hat Enterprise Linux 6.5. WUFT reports it as second among US public universities and third among all US universities on the November 2015 list and says a Dell representative attended the December 2015 unveiling, but the article does not name the vendor as builder; the Dell attribution rests on TOP500. Listed from November 2015 (rank 115) to June 2018 (rank 477). Not to be confused with the 2021 DGX SuperPOD recorded as hipergator-ai. Tier is reported.

Timeline

  • 2015-10 First operational source
  • 2015-10 An USD 8 million project added 30,000 cores to the existing HiPerGator, more than doubling its power source
  • 2015-11 List debut at #115 (November 2015) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Nearby in scale

The machines closest to HiPerGator 2.0 by Rmax, smaller to larger.

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partIntel Xeon E5-2698 v3
wuft.orgnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading