Supercomputers/Systems/Piz Daint
Switzerland · decommissioned · mixed
Piz Daint
Operated by CSCS at CSCS, Lugano .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 21.23 PFlop/s
- Rpeak
- 27.15 PFlop/s
- Rmax ÷ Rpeak
- 78.2%
- Cores
- 387,872
- Power
- 2.38 MW
- Per watt
- 8.9 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Cray XC50 | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | cscs.chhpe.com |
| Accelerator | NVIDIA Tesla P100 Accelerators CUDA (Pascal GP100) · 3,584C · 1.48 GHz · 16 nm · 300 W NVIDIA Tesla P100 | NVIDIA | - | Reported | cscs.chhpe.com |
| CPU | Intel Xeon E5-2690 v3 CPUs x86-64 · 12C · 2.6 GHz · 22 nm · 135 W Xeon E5-2690v3 12C 2.6GHz | Intel | - | Reported | cscs.chhpe.com |
| Interconnect | Cray Aries Interconnect Dragonfly · About 10 GB/s per direction · Around 1 microsecond Aries interconnect | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | cscs.chhpe.com |
| Storage | Lustre Storage Parallel filesystem, separate metadata and object servers Sonexion 3000 Storage Capacity 6.2 PB and Sonexion 1600 Storage Capacity 2.5 PB | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | cscs.ch |
| Cooling | Liquid-assisted air (in-cabinet coil) Cooling In-cabinet air, water-cooled coil · Roughly 20-45 kW per cabinet Cray XC50 cabinet: transverse air across in-cabinet water coils | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | cscs.chhpe.com |
| Operating system | Cray Linux Environment Operating systems Linux, Cray-customised · Proprietary layer over open-source Linux Cray Linux Environment | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | cscs.chhpe.com |
The read
Europe's fastest system for several years, and the direct predecessor of Alps on the same site. Cray XC50 with one P100 per node; the site retained the building, the lake-water cooling and the operator, and replaced everything else - which is what a refresh cycle actually looks like at the facility layer.
Timeline
- 2012 Announced source
- 2017-06 List debut at #3 (June 2017) source
- 2017-06 First operational source
- 2023 Decommissioned source
- 2025-01 Physically shut down for the last time, about two years after Alps took over production workloads source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
CSCS, Lugano
- Location
- Lugano, Switzerland
- Cooling
- Lake-water cooling (Lake Lugano)
- Commissioned
- 2012
Change history
- 2026-09-22 Gained a Green500 rank pointer (#68 on the 2023-11 list)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| cscs.ch | names system and part | NVIDIA Tesla P100, Intel Xeon E5-2690 v3, Cray Aries |
| hpe.com | does not name this system | Lustre |
Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.
Related news
- Piz Daint powered off after 13 years, cleared for Alps · CSCSCSCS retired the Cray XC50/XC40 system that had anchored Swiss GPU computing since 2012, closing out the last pre Grace Hopper system in this dataset's Swiss lineage and completing the multi year handover to Alps that began with Alps' 2024 inauguration.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
Power and cooling
Why air ran out at 20 kW a rack, how warm-water cooling removes the chillers, and what PUE conceals.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.