Supercomputers/Sites/Argonne Leadership Computing Facility

Lemont, IL · USA

Argonne Leadership Computing Facility

Operated by Argonne National Laboratory. Hosting 12 systems in this dataset, 7 of them currently operational.

Systems hosted
12
Installed Rmax
1.05 EFlop/s
all eras, as reported
Recorded power
45.71 MW
where disclosed
Cooling
Direct liquid cooling, warm water

Facility facts

Power, cooling and efficiency figures for Argonne Leadership Computing Facility, each with its own source and date.

FactValueAs ofBasisSource
Facility power 60 MW Argonne release of 2022-10-20: 14 substations provide 60 MW for Aurora, future systems and the building's day-to-day load. 2022-10 Operator stated newswise.com
Cooling Liquid cooling loop of 44,000 gallons connecting cooling towers, chillers, heat exchangers and a filtration system, with pipes from 4 to 30 inches Added in a new wing of the ALCF data centre for Aurora. 2022-10 Operator stated newswise.com

Systems at this site

SystemRmaxPowerFirst operationalStatus
Aurora 1.01 EFlop/s 38.70 MW 2023-12 operational
Sunspot - - 2022-12 operational
Polaris 25.81 PFlop/s - 2021 operational
Theta 5.88 PFlop/s 1.09 MW 2017-07 decommissioned
Cooley 240.40 TFlop/s 93.91 kW 2015 operational
Mira 8.59 PFlop/s 3.94 MW 2012-06 decommissioned
Cetus 715.55 TFlop/s 328.75 kW 2012 operational
Vesta (Argonne) 357.78 TFlop/s 164.38 kW 2012 operational
Magellan ALCF 38.66 TFlop/s 132 kW 2010-03 operational
Intrepid 458.61 TFlop/s 1.26 MW 2008-01 decommissioned
Solstice - - - planned
Equinox - - - planned

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.