Supercomputers/Systems/Aurora

USA · operational · mixed

Aurora

Also known as A21

Operated by Argonne National Laboratory at Argonne Leadership Computing Facility.

Phase 1 seed dataset — under review. These rows were compiled by hand from public operator, laboratory and vendor sources, and have not yet been through a second-reader verification pass. Every claim carries its source and a confidence tier; treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.01 EFlop/s
HPL measured
Rpeak
1.98 EFlop/s
Rmax ÷ Rpeak
51.1%
Cores
9,264,128
Power
38.70 MW
Per watt
26.2 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator
HPE Cray EX
Hewlett Packard Enterprise Reported alcf.anl.govintel.com
Accelerator Intel Data Center GPU Max 1550
Accelerators
Intel Data Center GPU Max, 6 per node
Intel 63,744
reported
Reported alcf.anl.govintel.com
CPU Intel Xeon CPU Max 9470
CPUs
Xeon CPU Max 9470 52C, 2 per node
Intel 21,248
reported
Reported alcf.anl.govintel.com
Interconnect HPE Slingshot-11
Interconnect
Slingshot-11
Hewlett Packard Enterprise Reported alcf.anl.govintel.com
Storage Intel DAOS
Storage
DAOS, 230 PB
Intel Reported alcf.anl.govintel.com
Cooling Direct liquid cooling, warm water
Cooling
direct liquid cooled cabinet
Hewlett Packard Enterprise Reported alcf.anl.govintel.com
Operating system HPE Cray Operating System
Operating systems
HPE Cray Operating System
Hewlett Packard Enterprise Reported alcf.anl.govintel.com

The read

The longest gap between announcement and first light of any system in this dataset — contracted in 2015 around a Xeon Phi design that was cancelled, redesigned around Ponte Vecchio, and delivered eight years later. That lag is the single data point most responsible for the shape of our announcement-to-first-light chart, and it is a vendor-execution story rather than a facility one. Two Xeon Max CPUs and six Data Center GPU Max accelerators per node, on HPE Slingshot-11 — a rare case of the accelerator and integrator roles sitting with different companies at this scale.

Timeline

  • 2015 Announced source
  • 2023-11 List debut at #2 (November 2023) source
  • 2023-12 First operational source

Public list appearances

Pointers only — rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Argonne Leadership Computing Facility

Location
Lemont, IL, USA
Cooling
Direct liquid cooling (warm water)
Commissioned
2006