Deep dive: Aurora: eight years from contract to first list

Also known as A21

Operated by Argonne National Laboratory at Argonne Leadership Computing Facility .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.01 EFlop/s
HPL measured
Rpeak
1.98 EFlop/s
Rmax ÷ Rpeak
51.1%
Cores
9,264,128
Power
38.70 MW
Per watt
26.2 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Aurora, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax1.01 EFlop/s#3 of 257 · top 1%#3 of 332 · top 1%
Energy efficiency26.2 GF/W#80 of 135 · bottom 42%#25 of 162 · top 15%
Rmax ÷ Rpeak51.1 %#242 of 256 · bottom 6%#309 of 331 · bottom 8%
Power draw38,698 kW#2 of 139 · top 1%#1 of 171 · highest

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cray EX
Hewlett Packard Enterprise - Reported alcf.anl.govintel.com
Accelerator Intel Data Center GPU Max 1550
Accelerators
oneAPI (Xe-HPC) · Intel 7 / TSMC N5 · 600 W
Intel Data Center GPU Max, 6 per node
Intel 63,744
reported
Reported alcf.anl.govintel.com
CPU Intel Xeon CPU Max 9470
CPUs
x86-64 · 52C · 2 GHz · Intel 7 · 350 W
Xeon CPU Max 9470 52C, 2 per node
Intel 21,248
reported
Reported alcf.anl.govintel.com
Interconnect HPE Slingshot-11
Interconnect
Dragonfly · 200 Gb/s per port · Around 2 microseconds
Slingshot-11
Hewlett Packard Enterprise - Reported alcf.anl.govintel.com
Storage Intel DAOS
Storage
Object store, no POSIX layer underneath · 230 PB on Aurora · About 31 TB/s
DAOS, 230 PB
Intel - Reported alcf.anl.govintel.com
Cooling Direct liquid cooling, warm water
Cooling
Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid
direct liquid cooled cabinet
Hewlett Packard Enterprise - Reported alcf.anl.govintel.com
Operating system HPE Cray Operating System
Operating systems
SUSE-derived Linux, container-based management · Proprietary layer over open-source Linux
HPE Cray Operating System
Hewlett Packard Enterprise - Reported alcf.anl.govintel.com

Engineering, funding and access

What Aurora runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes10,624 nodes21,248 Xeon Max CPUs and 63,744 Data Center GPU Max GPUs, 2 CPUs and 6 GPUs per node, 166 compute groups2025Operator statedarxiv.org
Total memory10,620 TBDDR5 only (10.62 PB); the paper also lists 9.52 PB of HBM2e across the CPUs and GPUs2025Operator statedarxiv.org
Storage capacity220 PBDAOS tier of 1,024 servers: about 260 PB raw, about 220 PB with 16+2 erasure coding; separate roughly 100 PB Lustre system2025Operator statedarxiv.org
Interconnect and topologyHPE Slingshot-11 single-dimension dragonfly, 175 groups (166 compute, 8 storage, 1 service), 2.12 PB/s injection bandwidth2025Operator statedarxiv.orgtop500.org

Software

ItemDetailAs ofBasisSource
Parallel filesystemDAOS (about 220 PB usable, 31 TB/s peak) plus a roughly 100 PB Lustre file system named Flare with 100 gateway nodes to DAOSDAOS ranked first on the IO500 production list at SC23 per the paper2025Operator statedarxiv.org
Job schedulerPBSThe paper mentions PBS job arrays for ensembles; system scheduler is not otherwise described there2025Operator statedarxiv.org
Programming and software stackIntel oneAPI compilers (icx, icpx, ifx) with SYCL, OpenMP 5 offload and OpenCL 3.0 over the Level Zero runtime2025Operator statedarxiv.org
Programming and software stackMPICH with PMIx and HPE Cray PALS launch; oneMKL, oneCCL and oneDAL librariesTOP500 lists aurora-mpich 51.2 and MKL 2023 update 22025Operator statedarxiv.org
Programming and software stackKokkos, RAJA, chipStar and OCCA portability layers; PyTorch, TensorFlow, Horovod, DeepSpeed and JAX for AI2025Operator statedarxiv.org

Funding

ItemDetailAs ofBasisSource
Funded byU.S. Department of EnergyExascale Computing Project application development ended in 20232025Operator statedarxiv.org

Access

ItemDetailAs ofBasisSource
How researchers get timeINCITE and ALCC allocations, with ESP early-science teams in the first campaignFirst production allocation period had 34 INCITE and 13 ALCC projects2025Operator statedarxiv.org

Results

ItemDetailAs ofBasisSource
Notable resultHPL-MxP mixed-precision benchmark of 11.64 exaflops on 9,500 nodes, first place at SC242024-11Operator statedarxiv.org
Notable resultHPL of 1.012 exaflops on 9,234 nodes, third place on the TOP500 at SC242024-11Operator statedarxiv.orgtop500.org

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 63,744 accelerators 2023-07 Operator stated Argonne release: 10,624 blades, 6 Intel Max GPUs each (product computed); the second page states 63,744 directly. news.uchicago.eduglennklockwood.com
Stated investment 0.5 USD bn 2019-03 Operator stated DOE 2019 announcement: contract valued at over $500M (Intel prime, Cray subcontractor). Original contract value, not final cost; excludes facility. energy.gov

Published benchmark results

The read

The longest gap between announcement and first light of any system in this dataset: contracted in 2015 around a Xeon Phi design that was cancelled, redesigned around Ponte Vecchio, and delivered eight years later. That lag is the single data point most responsible for the shape of our announcement-to-first-light chart, and it is a vendor-execution story rather than a facility one. Two Xeon Max CPUs and six Data Center GPU Max accelerators per node, on HPE Slingshot-11: a rare case of the accelerator and integrator roles sitting with different companies at this scale.

Timeline

  • 2015 Announced source
  • 2023-11 List debut at #2 (November 2023) source
  • 2023-12 First operational source
  • 2024-11 Ranked first on the HPL-MxP mixed-precision benchmark at 11.64 exaflops and third on the TOP500 at 1.012 exaflops at SC24 source
  • 2025-01-27 Entered production and general availability, with 16 early-science projects scaled to at least 2,000 nodes beforehand source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Argonne Leadership Computing Facility

Location
Lemont, IL, USA
Cooling
Direct liquid cooling (warm water)
Commissioned
2006

Change history

Nearby in scale

The machines closest to Aurora by Rmax, smaller to larger.

  • JUPITER · Germany, operational · 1,000 PFlop/s
  • HPC7 · Italy, operational · 571.5 PFlop/s
  • Eagle · USA, operational · 561.2 PFlop/s
  • Frontier · USA, upgraded · 1,353 PFlop/s
  • El Capitan · USA, operational · 1,809 PFlop/s
  • LineShine · China, operational · 2,198.4 PFlop/s

Same site

Same operator

  • Improv · USA, operational, 2023
  • BeBop · USA, operational, 2017
  • Blues · USA, operational, 2012
  • Cetus · USA, operational, 2012
  • Mira · USA, decommissioned, 2012
  • Vesta (Argonne) · USA, operational, 2012

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

One cited source was readable and does not mention this system; another could not be read because the host returned a bot challenge. The unreadable one may well be fine, so this is weaker evidence than a corroborated row and much stronger than an unsupported one. See how this check works.

Cited sourceResultFound on the page
alcf.anl.govcould not be fetched-
intel.comdoes not name this systemIntel Data Center GPU Max 1550, Direct liquid cooling, warm water, Intel Xeon CPU Max 9470

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Related news

  • Argonne's Aurora Supercomputer Powers 2 of the Largest Cosmological Simulations to Date · HPCwire
    Two cosmology runs used most of Aurora's nodes for several days, a rare public data point on how much of an exascale machine a single production job can occupy. It speaks to Aurora's usable scale in practice rather than its peak rating.
  • TOP500's 66th list confirms JUPITER as the first exascale system outside the US · TOP500
    El Capitan holds number one at a remeasured 1.809 exaflop/s and Frontier and Aurora hold two and three, so all three US exascale systems in this dataset keep their relative order. JUPITER's 1.000 exaflop/s Booster partition becomes the fourth exascale system worldwide and the first in Europe, confirming the milestone this dataset's earlier rows on Bull's JUPITER delivery had been building toward.
  • Aurora enters service at Argonne · Argonne Leadership Computing Facility
    Eight years after contract award, following the cancellation of its original Xeon Phi design and a redesign around Ponte Vecchio. The longest announcement-to-first-light gap in this dataset.

All news →

Further reading