Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.35 EFlop/s
HPL measured
Rpeak
2.06 EFlop/s
Rmax ÷ Rpeak
65.8%
Cores
9,066,176
Power
24.61 MW
Per watt
55.0 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Frontier, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax1.35 EFlop/s#2 of 246 · top 1%#2 of 332 · top 1%
Energy efficiency55.0 GF/W#20 of 130 · top 15%#12 of 162 · top 7%
Rmax ÷ Rpeak65.8 %#161 of 243 · bottom 35%#241 of 331 · bottom 28%
Power draw24,607 kW#4 of 133 · top 2%#3 of 171 · top 1%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cray EX235a
Hewlett Packard Enterprise - Verified olcf.ornl.govhpe.com
Accelerator AMD Instinct MI250X
Accelerators
ROCm (CDNA 2) · 1.7 GHz · TSMC N6 · 560 W
AMD Instinct MI250X, 4 per node
AMD 37,632
reported
Verified olcf.ornl.govhpe.com
CPU AMD EPYC 7A53 (Trento)
CPUs
x86-64 · 64C · 2 GHz · 7 nm · 280 W
AMD Optimized 3rd Generation EPYC 64C 2GHz
AMD 9,408
reported
Reported olcf.ornl.govhpe.com
Interconnect HPE Slingshot-11
Interconnect
Dragonfly · 200 Gb/s per port · Around 2 microseconds
Slingshot-11
Hewlett Packard Enterprise - Verified olcf.ornl.govhpe.com
Storage HPE Cray ClusterStor E1000
Storage
Lustre appliance, flash and disk tiers · 700 PB on Frontier (Orion) · About 10 TB/s peak
Orion, Lustre on ClusterStor E1000
Hewlett Packard Enterprise - Reported olcf.ornl.govhpe.com
Cooling Direct liquid cooling, warm water
Cooling
Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid
100% direct liquid cooled cabinet
Hewlett Packard Enterprise - Reported olcf.ornl.govhpe.com
Operating system HPE Cray Operating System
Operating systems
SUSE-derived Linux, container-based management · Proprietary layer over open-source Linux
HPE Cray Operating System
Hewlett Packard Enterprise - Reported olcf.ornl.govhpe.com

Engineering, funding and access

What Frontier runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes9,856 nodes77 cabinets of 128 nodes each; the user guide states 9,856 AMD compute nodes2025Operator stateddocs.olcf.ornl.gov
Storage capacity679 PBOrion usable namespace; each compute node also has two 1.92 TB NVMe devices2025Operator stateddocs.olcf.ornl.gov
Interconnect and topologyHPE Slingshot-11, four 200 Gb/s NICs per node (800 Gb/s injection bandwidth)2025Operator stateddocs.olcf.ornl.govtop500.org

Software

ItemDetailAs ofBasisSource
Parallel filesystemOrion Lustre (HPE ClusterStor), 679 PB usable namespace, plus node-local NVMe2025Operator stateddocs.olcf.ornl.gov
Job schedulerSlurm2025Operator stateddocs.olcf.ornl.gov
Programming and software stackHPE Cray OS 2.4 based on SUSE Linux Enterprise Server 15.4TOP500 lists the OS as HPE Cray OS2025Operator stateddocs.olcf.ornl.gov
Programming and software stackHIP, OpenMP GPU offload, OpenACC and SYCL programming models with Lmod environment modules2025Operator stateddocs.olcf.ornl.gov
Programming and software stackHPL run used gcc 12.3.0 and hipcc, ROCm 5.7.1, Intel MKL 2019 and cray-mpich 8.1.302024-11Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
Funded byU.S. Department of Energy (Office of Science)Hosted by ORNL in the Oak Ridge Leadership Computing Facility2019-05Operator statedornl.gov
Stated cost600 USD mContract valued at more than $600 million for system and technology development, awarded to Cray2019-05Operator statedornl.gov
ProcurementFirst CORAL-2 award: contract with Cray announced 7 May 2019 covering technology development, a center of excellence, early-delivery systems, the main system and multi-year supportOriginally targeted delivery in 2021 and acceptance in 20222019-05-07Operator statedornl.gov

Access

ItemDetailAs ofBasisSource
How researchers get timeINCITE, ALCC and Director's Discretionary allocations2025Operator statedolcf.ornl.gov
Access pagewww.olcf.ornl.gov/for-users/getting-started2025Operator statedolcf.ornl.gov

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 37,632 accelerators 2024-02 Operator stated OLCF slides: 9,408 nodes x 4 MI250X modules (product computed). Each module has 2 GCDs, so the OS sees 75,264 GPUs. olcf.ornl.gov
Stated investment 0.6 USD bn 2019-05 Operator stated DOE: total contract award valued at more than $600M for the system and technology development. Contract value, excludes facility upgrades. energy.gov
Facility power 40 MW 2020-09 Design target OLCF: about 40 MW of power and cooling provided to the Frontier data centre (new 2.5-mile line). Facility build target, not a metered draw. olcf.ornl.govolcf.ornl.gov
IT power 30 MW 2020-12 Design target OLCF program director before delivery: at peak Frontier will consume about 30 MW. Design-time estimate for the system, not metered. olcf.ornl.gov

Published benchmark results

The read

The first system to clear an exaflop on HPL. Every part of the compute node comes from AMD (a custom Trento EPYC linked to four MI250X modules by Infinity Fabric rather than PCIe) with HPE supplying the cabinet, the Slingshot-11 fabric and the Orion storage system. Two suppliers account for essentially the entire machine. Figures shown are the post-upgrade configuration.

Timeline

  • 2019 Announced source
  • 2019-05-07 DOE announces a contract valued at more than $600 million with Cray (CORAL-2) to deliver Frontier to ORNL source
  • 2022-05 First operational source
  • 2022-06 List debut at #1 (June 2022) source
  • 2024-11 Reported at 1.353 EFlop/s after node and configuration changes source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Oak Ridge Leadership Computing Facility

Location
Oak Ridge, TN, USA
Utility
Tennessee Valley Authority
Cooling
Direct liquid cooling (warm water)
Commissioned
1993

Change history

Nearby in scale

The machines closest to Frontier by Rmax, smaller to larger.

  • Aurora · USA, operational · 1,012 PFlop/s
  • JUPITER · Germany, operational · 1,000 PFlop/s
  • HPC7 · Italy, operational · 571.5 PFlop/s
  • El Capitan · USA, operational · 1,809 PFlop/s
  • LineShine · China, operational · 2,198.4 PFlop/s

Same site

Same operator

Same accelerator

  • Adastra · France, operational, 2022
  • Dardel · Sweden, operational, 2022
  • LUMI · Finland, upgraded, 2022
  • rzVernal · USA, operational, 2022
  • Setonix · Australia, operational, 2022
  • Tenaya · USA, operational, 2022

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
hpe.comdoes not name this systemDirect liquid cooling, warm water, HPE Cray Operating System, HPE Cray ClusterStor E1000
olcf.ornl.govnames system and partAMD Instinct MI250X, Direct liquid cooling, warm water, AMD EPYC 7A53 (Trento), HPE Cray Operating System, HPE Cray ClusterStor E1000

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Related news

  • TOP500's 66th list confirms JUPITER as the first exascale system outside the US · TOP500
    El Capitan holds number one at a remeasured 1.809 exaflop/s and Frontier and Aurora hold two and three, so all three US exascale systems in this dataset keep their relative order. JUPITER's 1.000 exaflop/s Booster partition becomes the fourth exascale system worldwide and the first in Europe, confirming the milestone this dataset's earlier rows on Bull's JUPITER delivery had been building toward.
  • ORNL, AMD and HPE announce Discovery and Lux as Frontier's AI-era successors · Oak Ridge Leadership Computing Facility
    Lux runs AMD Instinct MI355X on HPE nodes with Oracle Cloud Infrastructure integration and arrives first, in 2026; Discovery follows in 2028 on MI430X and is billed as beating Frontier on every part of the system, not just peak flops. This keeps ORNL's AMD based lineage going a full hardware generation past the MI300A in El Capitan and the MI250X in Frontier.
  • Frontier becomes the first system measured past one exaflop · Oak Ridge Leadership Computing Facility
    Every part of the compute node came from a single supplier, with HPE providing the cabinet, fabric and storage. Two companies account for essentially the whole machine.

All news →

Further reading