Compute·Atlas

Supercomputers/Systems/Summit

USA · decommissioned · mixed

Summit

Also known as OLCF-4

Operated by Oak Ridge National Laboratory at Oak Ridge Leadership Computing Facility.

Phase 1 seed dataset — under review. These rows were compiled by hand from public operator, laboratory and vendor sources, and have not yet been through a second-reader verification pass. Every claim carries its source and a confidence tier; treat anything below verified as a lead, not a citation.

Measured performance

Rmax
148.6 PFlop/s
HPL measured
Rpeak
200.8 PFlop/s
Rmax ÷ Rpeak
74.0%
Cores
2,414,592
Power
10.10 MW
Per watt
14.7 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator
IBM Power System AC922
IBM Reported olcf.ornl.govibm.com
Accelerator NVIDIA Tesla V100
Accelerators
NVIDIA Volta GV100, 6 per node
NVIDIA 27,648
reported
Reported olcf.ornl.govibm.com
CPU IBM POWER9 22C
CPUs
IBM POWER9 22C 3.07GHz
IBM 9,216
reported
Reported olcf.ornl.govibm.com
Interconnect Mellanox InfiniBand EDR
Interconnect
Dual-rail Mellanox EDR InfiniBand
Mellanox
NVDANASDAQ rolls up to NVIDIA
Reported olcf.ornl.govibm.com
Storage IBM Spectrum Scale ESS (GPFS)
Storage
Alpine, IBM Spectrum Scale
IBM Reported olcf.ornl.govibm.com
Operating system Red Hat Enterprise Linux
Operating systems
Red Hat Enterprise Linux for POWER
Red Hat
IBMNYSE rolls up to IBM
Reported olcf.ornl.govibm.com

The read

IBM POWER9 hosts with six NVIDIA V100s per node, coherently attached over NVLink rather than PCIe — the last leadership-class system to use a non-x86, non-Arm host CPU. Its retirement in late 2024 removed the largest remaining block of POWER installed base from the graph in a single step, which is visible as a discontinuity on the CPU-architecture share chart and is worth flagging whenever that chart is quoted.

Timeline

  • 2014 Announced source
  • 2018-06 List debut at #1 (June 2018) source
  • 2018-06 First operational source
  • 2024-11 Retired after six years of operation source
  • 2024-11 Decommissioned source

Public list appearances

Pointers only — rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Oak Ridge Leadership Computing Facility

Location
Oak Ridge, TN, USA
Utility
Tennessee Valley Authority
Cooling
Direct liquid cooling (warm water)
Commissioned
1993